What This Proves
- Transfer system design aligned with architectural requirements.
- Foundation design and structural detailing coordination.
- Stability and efficiency maintained without piled foundations.
Case Study
A 25-floor apartment tower with a mezzanine transfer system moving from RC columns at lower levels to RC walls through the typical floors.
This project is evidence for project management and training, multidisciplinary delivery and practical client-ready reporting.