Case Study

Sankey Viaduct Survey & Strengthening

Inspection and design-led intervention for one of the world's oldest operational railway viaducts, balancing safety, access, and heritage constraints.

Heritage viaductMerseyside, UK2024
Sankey Viaduct inspection image

What This Proves

  • Digital twin from drone surveys and laser scanning.
  • Spandrel strengthening, parapet upgrades, and drainage design support.
  • Reduced possession time through rope access and drone-enabled inspection.

Relevant Capability

This project is evidence for digital twins, multidisciplinary delivery and practical client-ready reporting.

Explore digital twins

Use It In An Enquiry

Reference this case study when you contact Ishtar so the enquiry starts from the right technical route.

Start an enquiry

Need a similar project route, review, survey, assessment, facility plan or delivery pack?

View all case studies