Case Study
Pooley Bridge Replacement
Replacement of a 250-year-old stone arch bridge destroyed by Storm Desmond, delivered under intense public attention and environmental constraint.
Bridge replacementCumbria, UK2020
What This Proves
- UK first stainless-steel tied arch road bridge with a 40m single-span crossing.
- Structural design, site supervision, inspection support, and river-environment coordination.
- Fast-track route to reconnect the village while protecting the River Eamont setting.
Relevant Capability
This project is evidence for bridge engineering, multidisciplinary delivery and practical client-ready reporting.
Explore bridge engineering
Use It In An Enquiry
Reference this case study when you contact Ishtar so the enquiry starts from the right technical route.
Start an enquiry
Need a similar project route, review, survey, assessment, facility plan or delivery pack?
View all case studies