What This Proves
- Drawing review and independent analytical model verification.
- ETABS model checks and wind tunnel data assessment.
- Technical recommendations issued to the designer.
Case Study
Two-tower development with 56 and 50 storeys respectively, each with two basement levels and demanding wind and structural-performance requirements.
This project is evidence for project management and training, multidisciplinary delivery and practical client-ready reporting.
Explore project management and trainingReference this case study when you contact Ishtar so the enquiry starts from the right technical route.
Start an enquiryNeed a similar project route, review, survey, assessment, facility plan or delivery pack?
View all case studies